The story continues....

Description of the project and general chit-chat concerning it...

Moderator: Muxxor

Locked
User avatar
mull
Site Admin
Posts: 223
Joined: Tue May 31, 2005 9:44 pm
Location: STHLM
Contact:

The story continues....

Post by mull »

I thought I might add some more material to this part of the forum since
there has been a growing amount of non-swedish visitors, and since some
of you might be returning customers it sucks to not get new material.

Here goes:
Image
Image
Fuel door was welded in place. Soldering will be made to smooth everything out.




Image
Image
Floors were cut away and replaced by 16 gauge sheet metal. Subframe added later on.




Image
Image
Passenger side firewall was cut and patched up.




Image
Image
Out with the old, in with the new... : )



Image
Image
Frame rails were cut and replaced...




Image
Image
Some pretty welds on the frame rails.




Image
Sub frame and floor pans in place.




Image
Image
Frame rails/ battery tray - before and after
Last edited by mull on Sat Feb 04, 2006 9:55 pm, edited 1 time in total.
User avatar
mull
Site Admin
Posts: 223
Joined: Tue May 31, 2005 9:44 pm
Location: STHLM
Contact:

Post by mull »

Some parts:

Image
New fuel filler/door

Image
Fuel cell (45 Liters)

Image
Nismo N1 engine block 3=)

Image
N1 Water Pump + N1 Oil Pump... Yummie :)
User avatar
mull
Site Admin
Posts: 223
Joined: Tue May 31, 2005 9:44 pm
Location: STHLM
Contact:

Post by mull »

Some candy arrived at PBZ today! Image


Image
Two mysterious boxes, I wonder what's inside?

Image
I have NO clue as to what's in this one ; )

Image
Whaddayaknow! Pistons! : )

Image
Yep, I'll be damned - PISTONS!

Image
Crower connecting rods...

Image
...yum : )
User avatar
mull
Site Admin
Posts: 223
Joined: Tue May 31, 2005 9:44 pm
Location: STHLM
Contact:

Latest and greatest

Post by mull »

Epoxy primer

Image

Image


Caulk/seam-sealer

Image

Image
Locked