there has been a growing amount of non-swedish visitors, and since some
of you might be returning customers it sucks to not get new material.
Here goes:


Fuel door was welded in place. Soldering will be made to smooth everything out.


Floors were cut away and replaced by 16 gauge sheet metal. Subframe added later on.


Passenger side firewall was cut and patched up.


Out with the old, in with the new... : )


Frame rails were cut and replaced...


Some pretty welds on the frame rails.

Sub frame and floor pans in place.


Frame rails/ battery tray - before and after